            Client
                        VB BelLogistic Ltd.
                    Year of realisation
                            2024
                                            Location
                            Minsk, Belarus
                Project stage
                    Design and work documentation 
                                    Type
                    Industrial enterprises
Category
                        
                            Logistic centres and storages
                        
                                    Key indicators
                    
                                                    S = 135 000 m2
                                                                    
                Multifunctional logistics complex Wildberries,135,000 sq.m., Minsk, Belarus
Warehouse complex lkz storage of consumer goods with an area of 134,562.7 m2 with an integrated administrative and household part, separate boiler house, pump house, fire tanks and other auxiliary engineering facilities.
Total building area: 4,749.3 m2
Construction volume: 24,052.5 m3
Warehouse:
Total building area: 134,562.7 m2
Construction volume: 2,575,308.6 m3
PROJECT SCOPE
 
    they trust us
            Client
                                        MT vest as
                                    Location
                                        Under NDA
                                    MT vest as
                                We confirm three-month cooperation between MT vest AS and ENECA in 2020. The subject of the contract was remote automation software programming. The team of ENECA helped with the programming if HVAC equipment and BMS system based on Johnson Controls and Easy IO PLCs. The projects covered administrative and commercial buildings based in Norway.
 
While working on the project, we used Teamviewer for coordination and Skype for communication. The team of ENECA was very flexible, diligent and client-oriented. Though there were some difficulties with communication and work flow at the beginning, we managed to establish a well-coordinated process afterwards. Work with ENECA was a good alternative to the direct hiring locally. I would recommend working with ENECA as your reliable outsourcing partner.
                                                    While working on the project, we used Teamviewer for coordination and Skype for communication. The team of ENECA was very flexible, diligent and client-oriented. Though there were some difficulties with communication and work flow at the beginning, we managed to establish a well-coordinated process afterwards. Work with ENECA was a good alternative to the direct hiring locally. I would recommend working with ENECA as your reliable outsourcing partner.
Client
                                        CCHE Genève SA
                                    Location
                                        Under NDA
                                    CCHE Genève SA
                                I needed 3D renders for one of the projects and decided to go with ENECA. I was satisfied with everything from communication to the quality and speed of work
                                                    Client
                                        ASK Romein Staalbouw BV
                                    Location
                                        Under NDA
                                    ASK Romein Staalbouw BV
                                We have been working closely with Eneca since June 2020. Eneca has proved itself as a trustworthy and responsible partner in steel structural design. We have accomplished more than
10 project areas together and discussed for some other future opportunities. Their engineering team is located abroad, however, the remote work is well-organized.
 
The design process always requires flexibility and capability to think differently, and we were pleased to see Eneca’s readiness to support us and solve all the project issues together. When there was a need to do some quick revisions at a very late stage, Eneca's specialists performed them in a high qualitative and timely manner. The technical competence and deep Tekla knowledge of Eneca’s team as well as their high-performance efficiency and always keen in continuous improvement, provided us an important support in our engineering process.
 
 
                                                    10 project areas together and discussed for some other future opportunities. Their engineering team is located abroad, however, the remote work is well-organized.
The design process always requires flexibility and capability to think differently, and we were pleased to see Eneca’s readiness to support us and solve all the project issues together. When there was a need to do some quick revisions at a very late stage, Eneca's specialists performed them in a high qualitative and timely manner. The technical competence and deep Tekla knowledge of Eneca’s team as well as their high-performance efficiency and always keen in continuous improvement, provided us an important support in our engineering process.