Installation for Landfill Gas Recovery and Electricity and Heat Generation at the Novo-Mileevka
Design and estimate documentation for the "Installation for Landfill Gas Recovery and Electricity and Heat Generation at the Novo-Mileevka Solid Waste Landfill in Mogilev District."
The project involves a biogas complex for recovering landfill gas from the solid waste landfill body and generating electricity and heat (heat is dissipated through dry cooling towers) through regeneration in a cogeneration unit (hereinafter referred to as the CHP block-container). The complex layout includes: a CHP block-container equipped with a gas piston generator; a gas compressor unit (GCU) block-container; an open-type transformer substation; a flare stack; condensate and blow-down wells; and the construction of a gas pipeline system and gas wells.
The biogas plant generates 835 kW of electricity.
The biogas complex produces 835 kW/h of 10 kV electricity.
While working on the project, we used Teamviewer for coordination and Skype for communication. The team of ENECA was very flexible, diligent and client-oriented. Though there were some difficulties with communication and work flow at the beginning, we managed to establish a well-coordinated process afterwards. Work with ENECA was a good alternative to the direct hiring locally. I would recommend working with ENECA as your reliable outsourcing partner.
10 project areas together and discussed for some other future opportunities. Their engineering team is located abroad, however, the remote work is well-organized.
The design process always requires flexibility and capability to think differently, and we were pleased to see Eneca’s readiness to support us and solve all the project issues together. When there was a need to do some quick revisions at a very late stage, Eneca's specialists performed them in a high qualitative and timely manner. The technical competence and deep Tekla knowledge of Eneca’s team as well as their high-performance efficiency and always keen in continuous improvement, provided us an important support in our engineering process.