Find
Biogas complex at the sewage treatment plant, Slonim, Belarus
Client
Arginta
Year of realisation
2020
Location
Belarus
Type
Renewable Energy


Category
Biogas complexes
Key indicators
Nэл.=0,3 МВт Qтеп.=0,3 МВт

Biogas complex at the sewage treatment plant, Slonim, Belarus

Development of design and estimate documentation for Biogas complex at the sewage treatment facilities of Slonim city, including development and approval of design and estimate documentation, construction, commissioning.

The functional purpose of the facility is to produce biogas by anaerobic digestion from sewage treatment plant sludge, which is used for combined heat and power generation.

Technological raw materials for biogas production are raw sludge from the treatment plant, excess activated sludge and organic material delivered by road. The organic material is sanitised slaughterhouse waste.

The total digestion capacity is 115 m3/day of substrate with solid content of 3-5.5%.

they trust us
Client
MT vest as
Location
Under NDA
We confirm three-month cooperation between MT vest AS and ENECA in 2020. The subject of the contract was remote automation software programming. The team of ENECA helped with the programming if HVAC equipment and BMS system based on Johnson Controls and Easy IO PLCs. The projects covered administrative and commercial buildings based in Norway.

While working on the project, we used Teamviewer for coordination and Skype for communication. The team of ENECA was very flexible, diligent and client-oriented. Though there were some difficulties with communication and work flow at the beginning, we managed to establish a well-coordinated process afterwards. Work with ENECA was a good alternative to the direct hiring locally. I would recommend working with ENECA as your reliable outsourcing partner.
Client
CCHE Genève SA
Location
Under NDA
I needed 3D renders for one of the projects and decided to go with ENECA. I was satisfied with everything from communication to the quality and speed of work
Client
ASK Romein Staalbouw BV
Location
Under NDA
We have been working closely with Eneca since June 2020. Eneca has proved itself as a trustworthy and responsible partner in steel structural design. We have accomplished more than
10 project areas together and discussed for some other future opportunities. Their engineering team is located abroad, however, the remote work is well-organized.

The design process always requires flexibility and capability to think differently, and we were pleased to see Eneca’s readiness to support us and solve all the project issues together. When there was a need to do some quick revisions at a very late stage, Eneca's specialists performed them in a high qualitative and timely manner. The technical competence and deep Tekla knowledge of Eneca’s team as well as their high-performance efficiency and always keen in continuous improvement, provided us an important support in our engineering process.